Projectors & Speakers

Shop home and office projectors, PC speakers and soundbars for movies, gaming and presentations at TechCure India. Every order comes with a GST invoice, genuine warranty support and insured delivery to any pin code in India — and our team in Surat is on WhatsApp if you need help choosing.

Projectors and speakers for entertainment setups.

Skip to results list

Active filters:

447 items
Column grid
Column grid

Filter

Active filters:

  • Honeywell Suono V210 Bluetooth 6.0 Speaker, 5W, Deep Bass Dual Radiators, 10H Playback, IPX6, Dual Speaker Pairing, RGB Light, USB/AUX/SD, Type-C Charging, Built-in Mic, 2yr Manufacturer Warranty

    Honeywell Suono V210 Bluetooth 6.0 Speaker, 5W, Deep Bass Dual Radiators, 10H Playback, IPX6, Dual Speaker Pairing, RGB Light, USB/AUX/SD, Type-C Charging, Built-in Mic, 2yr Manufacturer Warranty

    ₹4,359
  • Honeywell Moxie V200 Wireless Bluetooth V5.3 Portable Speaker 5W, 12Hrs Playtime, Advanced 52mm Drivers, IPX4, Connect 2 Speakers with TWS Feature, Premium Stereo Sound, Multi Compatibility Mode Orange

    Honeywell Moxie V200 Wireless Bluetooth V5.3 Portable Speaker 5W, 12Hrs Playtime, Advanced 52mm Drivers, IPX4, Connect 2 Speakers with TWS Feature, Premium Stereo Sound, Multi Compatibility Mode Orange

    ₹2,909
  • Honeywell Moxie V200 Wireless Bluetooth V5.3 Portable Speaker 5W, 12Hrs Playtime, Advanced 52mm Drivers, IPX4, Connect 2 Speakers with TWS Feature, Premium Stereo Sound, Multi Compatibility Mode

    Honeywell Moxie V200 Wireless Bluetooth V5.3 Portable Speaker 5W, 12Hrs Playtime, Advanced 52mm Drivers, IPX4, Connect 2 Speakers with TWS Feature, Premium Stereo Sound, Multi Compatibility Mode

    ₹2,909
  • Honeywell Suono P310 Bluetooth 6.0 Speaker, 10W, Deep Bass Dual Radiators, 12H Playback, IPX6, Dual Speaker Pairing, RGB Lights, USB/AUX/SD, Type-C Charging, Built-in Mic, 2yr Manufacturer Warranty

    Honeywell Suono P310 Bluetooth 6.0 Speaker, 10W, Deep Bass Dual Radiators, 12H Playback, IPX6, Dual Speaker Pairing, RGB Lights, USB/AUX/SD, Type-C Charging, Built-in Mic, 2yr Manufacturer Warranty

    ₹5,399
  • BenQ LH750 1080P Full HD Business LED Projector 5000 Lumens

    BenQ LH750 1080P Full HD Business LED Projector 5000 Lumens

    ₹131,869
  • UGREEN Gold Plated 3.5mm 1/8 TRS to 6.35mm 1/4 TS Mono Y-Cable Splitter Cord for iPhone iPod Computer Sound Cards CD Players Multimedia Speakers and Home Stereo Systems 2m 6ft

    UGREEN Gold Plated 3.5mm 1/8 TRS to 6.35mm 1/4 TS Mono Y-Cable Splitter Cord for iPhone iPod Computer Sound Cards CD Players Multimedia Speakers and Home Stereo Systems 2m 6ft

    ₹1,069
  • Ant Esports View 690 AF 1080P Smart Projector - White

    Ant Esports View 690 AF 1080P Smart Projector - White

    ₹12,889
  • Acer SA272 P1 27 Inch Full HD IPS Ultra Slim (7.2mm Thick) Backlit LED Monitor I Zero Frame I 144Hz Refresh I 1 MS VRB I AMD FreeSync I 1xHDMI 1xVGA I Speakers I Eye Care I Eco Display

    Acer SA272 P1 27 Inch Full HD IPS Ultra Slim (7.2mm Thick) Backlit LED Monitor I Zero Frame I 144Hz Refresh I 1 MS VRB I AMD FreeSync I 1xHDMI 1xVGA I Speakers I Eye Care I Eco Display

    ₹10,389
  • Ant Esports View 821 AI 1080P AI-Enabled Smart Projector - Black

    Ant Esports View 821 AI 1080P AI-Enabled Smart Projector - Black

    ₹18,199
  • Ant Esports View 515 Plus HD Smart Projector - White

    Ant Esports View 515 Plus HD Smart Projector - White

    ₹6,179
  • Ant Esports GS170 2.0 Channel Stereo Gaming Speaker

    Ant Esports GS170 2.0 Channel Stereo Gaming Speaker

    ₹539
  • Honeywell Moxie V1000 10W 2.0 Channel V5.0 Wireless Bluetooth Soundbar, 5.0 Stereo Sound, 52mm*2 Drivers, 15Hrs Playtime, TWS, 1200mAh Battery, Multiple Connectivity via SD Card, Audio Jack & USB

    Honeywell Moxie V1000 10W 2.0 Channel V5.0 Wireless Bluetooth Soundbar, 5.0 Stereo Sound, 52mm*2 Drivers, 15Hrs Playtime, TWS, 1200mAh Battery, Multiple Connectivity via SD Card, Audio Jack & USB

    ₹3,529
  • Ant Esports GS510 RGB Gaming Speaker

    Ant Esports GS510 RGB Gaming Speaker

    ₹959
  • Honeywell Zest Charger PD20W, Type C Ultra-Fast Wall Charger with PPS Support, BIS Certified, Compatible with iPhone, iPad, Samsung, Oneplus, Smartphones, Tablets, TWS, Bluetooth Speaker

    Honeywell Zest Charger PD20W, Type C Ultra-Fast Wall Charger with PPS Support, BIS Certified, Compatible with iPhone, iPad, Samsung, Oneplus, Smartphones, Tablets, TWS, Bluetooth Speaker

    ₹1,549
  • ZEBRONICS Pixigo A16, 15.6 inch Portable Monitor, FHD 1080p, 180° Adjustable Stand, Lightweight, 16:9 Aspect Ratio, 300Nits, 16.7M Colors, Dual Input - Type C + Mini HDMI, Built-in Speakers

    ZEBRONICS Pixigo A16, 15.6 inch Portable Monitor, FHD 1080p, 180° Adjustable Stand, Lightweight, 16:9 Aspect Ratio, 300Nits, 16.7M Colors, Dual Input - Type C + Mini HDMI, Built-in Speakers

    ₹9,579
  • ZEBRONICS PIXAPLAY 17, Smart LED Projector, 6000 Lumens, 4K Support, Dolby Audio, 224 Inch Screen Size, HDMI, USB, WiFi, 1080p Native, APP Support, Miracast, Auto Keystone

    ZEBRONICS PIXAPLAY 17, Smart LED Projector, 6000 Lumens, 4K Support, Dolby Audio, 224 Inch Screen Size, HDMI, USB, WiFi, 1080p Native, APP Support, Miracast, Auto Keystone

    ₹21,679
  • Honeywell Digital Optical Audio Toslink Cable 2 meter, 24K Gold Plated Connectors, PVC Jacketed Copper Wire, Compatible with Home Theatres (7.1), Xbox, PS5, soundbars,Blu-ray players & Gaming Consoles

    Honeywell Digital Optical Audio Toslink Cable 2 meter, 24K Gold Plated Connectors, PVC Jacketed Copper Wire, Compatible with Home Theatres (7.1), Xbox, PS5, soundbars,Blu-ray players & Gaming Consoles

    ₹879
  • ASUS ZenBeam Latte L1 Portable LED Projector – 300 Lumens, 720p, Sound by Harman Kardon, 10 W Bluetooth® Speaker, 3-hour Video Playback, Wireless Projection, Built-in Battery, USB Type-A, HDMI®

    ASUS ZenBeam Latte L1 Portable LED Projector – 300 Lumens, 720p, Sound by Harman Kardon, 10 W Bluetooth® Speaker, 3-hour Video Playback, Wireless Projection, Built-in Battery, USB Type-A, HDMI®

    ₹45,029
  • Honeywell Trueno U300 Bluetooth 5.3 Wireless Portable Speaker, 20W Output, Dual 78mm Drivers, Deep Bass, 13H Playtime, IPX6, TWS Pairing, SD/USB Type-C/AUX Support, Built-in Mic, 2-Year Warranty-Black

    Honeywell Trueno U300 Bluetooth 5.3 Wireless Portable Speaker, 20W Output, Dual 78mm Drivers, Deep Bass, 13H Playtime, IPX6, TWS Pairing, SD/USB Type-C/AUX Support, Built-in Mic, 2-Year Warranty-Black

    ₹6,439
  • Ant Esports 690 Projector (ATPRJ0004)

    Ant Esports 690 Projector (ATPRJ0004)

    ₹11,439
  • Ant Esports View 822 1080p Smart Cinema Projector (APJR0001)

    Ant Esports View 822 1080p Smart Cinema Projector (APJR0001)

    ₹27,039
  • REDRAGON GS560 Adiemus 4 Watt 2.0 Channel USB Soundbar (Black)

    REDRAGON GS560 Adiemus 4 Watt 2.0 Channel USB Soundbar (Black)

    ₹2,069
  • EVM EnBar Pro Bluetooth Speaker EVM-BTS106-B

    EVM EnBar Pro Bluetooth Speaker EVM-BTS106-B

    ₹1,349
  • NZXT Relay PC Gaming Desktop Speakers – White AP-SPKW2-UK

    NZXT Relay PC Gaming Desktop Speakers – White AP-SPKW2-UK

    ₹17,999