Official brand store

EVM

Genuine EVM products at TechCure India — GST invoice, brand warranty and delivery across India. Explore the EVM collection at TechCure India. We offer a variety of EVM products including RAM, such as the EVM 16GB 6000...

  • ✓ Genuine & sealed
  • ✓ GST invoice
  • ✓ Brand warranty
  • ✓ Delivery across India
313products
13categories
Build a PC with EVM →

Shop EVM by category

All EVM products ↓

Skip to results list

Active filters:

313 items
Column grid
Column grid

Filter

Active filters:

  • EVM 1TB 2.5-Inch SATA III Internal SSD

    EVM 1TB 2.5-Inch SATA III Internal SSD

    ₹9,597MRP ₹15,000 · 36% OFF

    EVMincl. GSTIn stock✓ GST invoice

    1 TB · SATA

  • EVM N500 1024GB NVMe GEN4 SSD EVMNV500/1024GB

    EVM N500 1024GB NVMe GEN4 SSD EVMNV500/1024GB

    ₹14,599

    EVMincl. GSTOn Order – On Availability✓ GST invoice

    1 TB · NVMe PCIe Gen4 · PCIe Gen4 16GT/s

  • EVM 1TB M.2 SATA SSD EVMM2/1TB

    EVM 1TB M.2 SATA SSD EVMM2/1TB

    ₹12,613MRP ₹17,500 · 27% OFF

    EVMincl. GSTIn stock✓ GST invoice

    1 TB · SATA · up to 550MB/s

  • EVM 1TB 2242 NVMe SSD EVMNV42/1TB

    EVM 1TB 2242 NVMe SSD EVMNV42/1TB

    ₹21,007MRP ₹25,000 · 15% OFF

    EVMincl. GSTIn stock✓ GST invoice

    1 TB · NVMe PCIe Gen3 · NVMe M.2 2242

  • EVM 128GB NVME M.2 INTERNAL SSD EVMNV/128GB

    EVM 128GB NVME M.2 INTERNAL SSD EVMNV/128GB

    ₹3,040MRP ₹3,192 · 4% OFF

    EVMincl. GSTIn stock✓ GST invoice

    128 GB · NVMe PCIe Gen3 · Engineered to withstand shocks up to 1500...

  • EVM 16GB 6000 MHz High-Performance DDR5 Desktop RAM

    EVM 16GB 6000 MHz High-Performance DDR5 Desktop RAM

    ₹27,239

    EVMincl. GSTOn Order – On Availability✓ GST invoice

    DDR5 · 16 GB · 6000 MHz

  • EVM 1TB INTERNAL SATA SSD EVM25/1TB

    EVM 1TB INTERNAL SATA SSD EVM25/1TB

    ₹11,702MRP ₹18,999 · 38% OFF

    EVMincl. GSTIn stock✓ GST invoice

    1 TB · SATA · Built with 3D NAND flash technology for durable, stab...

  • Evm 2Tb M.2 Nvme Internal Ssd (EVMNV/2TB)

    Evm 2Tb M.2 Nvme Internal Ssd (EVMNV/2TB)

    ₹29,800MRP ₹32,500 · 8% OFF

    EVMincl. GSTIn stock✓ GST invoice

    2 TB · NVMe PCIe Gen3 · M.2

  • EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)

    EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)

    ₹1,525

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)

    EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)

    ₹1,365

    EVMincl. GSTIn stock✓ GST invoice

  • EVM WLKM 036 WiFi Keyboard and Mouse Combo (WLKM-036)

    EVM WLKM 036 WiFi Keyboard and Mouse Combo (WLKM-036)

    ₹1,025MRP ₹1,499 · 31% OFF

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (Black) (WDKM-612-BLACK-GREY)

    EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (Black) (WDKM-612-BLACK-GREY)

    ₹1,525

    EVMincl. GSTIn stock✓ GST invoice

  • EVM Enkey WiFi Keyboard and Mouse Combo (WLKM-3W042)

    EVM Enkey WiFi Keyboard and Mouse Combo (WLKM-3W042)

    ₹1,025MRP ₹1,399 · 26% OFF

    EVMincl. GSTIn stock✓ GST invoice

  • Evm 1TB 2.5 Inch Sata Internal Ssd (EVM25/1TB)

    Evm 1TB 2.5 Inch Sata Internal Ssd (EVM25/1TB)

    ₹13,100MRP ₹14,500 · 9% OFF

    EVMincl. GSTIn stock✓ GST invoice

    1 TB · SATA

  • Evm 512GB Internal Ssd (EVM25-512GB)

    Evm 512GB Internal Ssd (EVM25-512GB)

    ₹6,200MRP ₹8,999 · 31% OFF

    EVMincl. GSTIn stock✓ GST invoice

    512 GB · SATA · 2.5 Inch

  • EVM EnSport Bluetooth NeckBand EVM-NB027-O

    EVM EnSport Bluetooth NeckBand EVM-NB027-O

    ₹344

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B

    EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B

    ₹377

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-RB

    EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-RB

    ₹377

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnBar Pro Bluetooth Speaker EVM-BTS106-B

    EVM EnBar Pro Bluetooth Speaker EVM-BTS106-B

    ₹1,275

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnZest C Truly Earbuds EVM-TWS-K11-W

    EVM EnZest C Truly Earbuds EVM-TWS-K11-W

    ₹654

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnZest Neo Truly Earbuds EVM-TWS-K12-W

    EVM EnZest Neo Truly Earbuds EVM-TWS-K12-W

    ₹558

    EVMincl. GSTIn stock✓ GST invoice

  • EVM EnBuds Air Truly Earbuds EVM-TWS-K13-BU

    EVM EnBuds Air Truly Earbuds EVM-TWS-K13-BU

    ₹879

    EVMincl. GSTOn Order – On Availability✓ GST invoice

  • EVM EnSave 1TB Smallest Portable External SSD with 3D NAND Flash EPSSD/1TB

    EVM EnSave 1TB Smallest Portable External SSD with 3D NAND Flash EPSSD/1TB

    ₹14,949

    EVMincl. GSTOn Order – On Availability✓ GST invoice

  • EVM Elite 512GB EnSave Pro Smallest Portable SSD EPSSDPro/512G

    EVM Elite 512GB EnSave Pro Smallest Portable SSD EPSSDPro/512G

    ₹9,962

    EVMincl. GSTIn stock✓ GST invoice