EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B
🚚 Shipping ₹379 · FREE on orders above ₹25,000
In stock · dispatched in 1–2 working days
Delivery across India in 2–8 days · insured
- Genuine productBrand warranty · terms
- GST invoiceClaim input credit
- 7-day returnsOn PC components
- Insured deliveryAll over India
Secure payments by Razorpay · UPI, cards, net banking, EMI
EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B — Genuine EVM product, sold and supported by TechCure India. Available from TechCure India with insured delivery to every serviceable pin code in India. Key specifications EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B Battery: 200mAh Bluetooth Version: V5.2 Playing Time:...
About this product
EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B — Genuine EVM product, sold and supported by TechCure India. Available from TechCure India with insured delivery to every serviceable pin code in India.
Key specifications
- EVM EnSport 2.0 Bluetooth Neckband EVM-NB036-B
- Battery: 200mAh
- Bluetooth Version: V5.2
- Playing Time: upto 25Hrs
- Bluetooth Distance: >10M
- Frequency Range: 100Hz-10KHz
- Standby time: 250Hrs
- Input Charging Power: DC5V 1A
- Support Profile: HEP, HSP, A2DP, AVRCP
- Charge Temperature: 20oC-50oC
Why buy from TechCure India
- 100% genuine product with full manufacturer warranty
- GST tax invoice on every order — claim input credit for your business
- Insured, foam-packed shipping to every serviceable pin code in India
- Free compatibility check with your existing PC — message us on WhatsApp before you order
- Custom PC builds, upgrades and expert setup support — delivered and supported anywhere in India
Specifications
| Brand | EVM |
|---|---|
| Category | Earbuds |
| Model / MPN | EVM-NB036-B |
| Condition | New, sealed box |
| Warranty | Manufacturer warranty · details |
| Invoice | GST tax invoice (input credit available) |
| Delivery | Insured shipping to every serviceable pin code in India |
Need help choosing?
Send us your current build or budget — we'll confirm compatibility and suggest the right earbuds for free.
Ask on WhatsAppQuestions? Chat with a PC expert on WhatsApp
In stock · dispatch in 1–2 working days
- UPI · Cards · Net banking · EMI via Razorpay
- GST invoice · genuine brand warranty
- Insured delivery across India · Track order
- Read our Google reviews
Similar products
You may also like
🔥 #1
MSI
MSI MAG 275F 27 inch Full HD HDR 180 Hz Gaming Monitor
₹11,489
🔥 #2
ACER
Acer AL14-71P NX.D7USI.001 i5-13500H, 16GB, 512GB SSD, UHD Graphics, Windows 11 Home, WUXGA, 14 inch, Silver
₹72,390
🔥 #3
CORSAIR
Corsair Vengeance DDR5 16GB 5600MHz CL40 Black Desktop Memory CMK16GX5M1B5600Z40
₹29,399
MSI
MSI PRO MP341CQW E12 34 Inch 2K UWQHD 120Hz VA Panel 114% SRGB 1MS Adaptive Sync Curved Business Monitor (White)
₹23,549
PowerColor
PowerColor Reaper RX 9070 16GB GDDR6 Graphics Card
₹79,800
Samsung
Samsung 43 Inch 4K M7 Vision AI Smart Monitor UHD LS43FM701UWXXL
₹34,299
ASUS
ASUS Prime B650M-R DDR5 AMD Motherboard
₹10,720
TechCure India
TechCure India PC for Trading – AMD Ryzen 5 5600GT, Integrated Graphics, 16GB DDR4, 240GB SSD
₹52,773
AMD
AMD Ryzen 5 5500 6 Cores Upto 4.2GHz AM4 Processor
₹10,600
Intel
INTEL Core Ultra 5 245K Processor (5.2 GHz / 14 Cores / 14 Threads)
₹22,500
Circle
Circle Eliminator X5 Black Mid Tower Computer Case | Gaming Cabinet - Black
₹4,559
Ant Esports
ANT ESPORTS GM610 Crystal Wired Ambidextrous RGB Gaming Mouse (GM610-RGB) (12800DPI / 7 Macro Buttons) (White)
₹687
See alltrending now →
PowerColor
PowerColor Reaper RX 9070 16GB GDDR6 Graphics Card
₹79,800
Intel
INTEL Core i5 12400F 12th Generation Processor (4.4 GHz / 6 Cores / 12 Threads)
₹14,400
Samsung
Samsung 43 Inch 4K M7 Vision AI Smart Monitor UHD LS43FM701UWXXL
₹34,299
MSI
MSI Z790 Gaming Plus Wifi DDR5 Intel Motherboard
₹24,671
ASUS
ASUS Prime B650M-R DDR5 AMD Motherboard
₹10,720
MSI
MSI MAG 275F 27 inch Full HD HDR 180 Hz Gaming Monitor
₹11,489
AMD
AMD RYZEN 5 9600X 9th Generation Processor (5.4 GHz / 6 Cores / 12 Threads)
₹20,700
AMD
AMD Ryzen 3 3200G 3rd Generation Processor (4GHz / 4 Cores / 4 Threads)
₹6,580
TechCure India
TechCure India PC for Trading – AMD Ryzen 5 5600GT, Integrated Graphics, 16GB DDR4, 240GB SSD
₹52,773
AMD
AMD Ryzen 5 5500 6 Cores Upto 4.2GHz AM4 Processor
₹10,600
Intel
INTEL Core Ultra 5 245K Processor (5.2 GHz / 14 Cores / 14 Threads)
₹22,500
Circle
Circle Eliminator X5 Black Mid Tower Computer Case | Gaming Cabinet - Black
₹4,559
See allmost viewed →
ASUS
ASUS ROG Zephyrus G16 16 inch INTEL Ultra 9 386H RTX5070Ti 12GB GPU DDR5 32GB RAM 2TB SSD Gaming Laptop GU606AR-TB039WS
₹412,429
Gigabyte
Gigabyte RTX 5080 Aero OC SFF 16GB Graphics Card
₹265,500
PowerColor
PowerColor AMD Radeon AI PRO R9700 32GB GDDR6 Graphics Card
₹269,229
ASUS
Asus ZENBOOK S14 OLED 14.0 Inch Intel Core Ultra 7 256V 16GB RAM 1TB SSD Integrated GPU Gaming Laptop UX5406SA-PZ448WS
₹145,872
Dell
Dell 32 Plus 4K QD-OLED Monitor - S3225QC
₹75,690
Kingston
Kingston Fury Beast 64GB 6000MHz CL30 DDR5 RAM
₹163,289
AMD
AMD Ryzen Threadripper Pro 7965WX 7th Generations OEM Processor (5.3 GHz / 24 Cores / 48 Threads)
₹278,499
ASUS
ASUS VIVOBOOK 16 16 inch inch AMD RYZEN 5 150 16GB RAM 512GB SSD AMD Radeon Graphics Laptop M1605NAQ-MB095WS
₹80,650
Kingston
Kingston Fury Beast 64GB 6000MHz CL36 DDR5 RAM
₹134,892
Gigabyte
Gigabyte GeForce RTX 5070 WINDFORCE SFF 12G Graphics Card
₹95,923
ASUS
Asus VIVOBOOK 14 14.0 Inch AMD RYZEN AI 5 330 16GB RAM 512GB SSD Integrated GPU Gaming Laptop M1407KA-LY131WS
₹68,347
Gigabyte
Gigabyte Aorus Rtx 5080 Master 16Gb Graphics Card
₹265,500
See allbest offers →